Formulasi Klausul Perubahan Desain dalam Kontrak Design and Build untuk Menjamin Kepastian Hukum

Authors

  • Universitas Bung Karno Author
  • Universitas Bung Karno Author
  • Universitas Bung Karno Author

DOI

10.59017/setara.v7i1.594

Keywords:

Design and Build Contract, Design Change Clause, Legal Certainty, Construction Procurement, Contract Addendum

Abstract

This study examines how design change clauses should be formulated in design and build contracts so that legal certainty is maintained when the scope, cost, and time of construction work change during implementation. The issue is relevant because Indonesian construction law has recognized integrated construction services, while procurement regulations have continued to develop through Presidential Regulation Number 16 of 2018 and its amendments up to Presidential Regulation Number 46 of 2025. However, the prevailing regulatory framework still leaves room for uncertainty regarding the authority to propose design changes, the evaluation process, the approval mechanism, and the proportional adjustment of contract value and completion time. This research uses normative legal methods with statutory, conceptual, and comparative approaches. The findings show that legal certainty in design and build contracts cannot rely solely on general change-order clauses, because design changes directly affect risk allocation, quality control, and project accountability. Therefore, the article formulates a model clause consisting of written submission, documented technical and financial evaluation, clearly identified approval authority, proportional compensation adjustment, and mandatory addendum documentation. Such a clause can reduce multi-interpretation, strengthen contractual balance, and provide more predictable legal protection for both service users and service providers.

References

Abdul Nabi, M., El-adaway, I. H., Fayek, S., Howell, C., & Gambatese, J. (2020). Contractual guidelines for construction safety-related issues under design-build standard forms of contract. Journal of Construction Engineering and Management, 146(7), Article 04020074. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001855

Abotaleb, I. S., & El-adaway, I. H. (2017). Administering employers’ payment obligations under national and international design-build standard forms of contract. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 9(2), Article 04517003. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000213

Ahmed, M. O., Assaad, R. H., El-adaway, I. H., Echele, E., Govro, K., & Watson, J. (2022).

Administering change orders in highway projects. Journal of Legal Affairs and

Dispute Resolution in Engineering and Construction, 14(2), Article 05021010. https: //doi.org/10.1061/(ASCE)LA.1943-4170.0000528

El-adaway, I. H., Fawzy, S., Ahmed, M., & White, R. (2016). Administering extension of time under national and international standard forms of contracts: A contractor’s perspective. Journal of Legal Affairs and Dispute Resolution in Engineering and

Construction, 8(2), Article 04516001. https://doi.org/10.1061/(ASCE)LA.19434170.0000182

El-adaway, I. H., Fawzy, S., Allard, T., & Runnels, A. (2016). Change order provisions under national and international standard forms of contract. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 8(3), Article 03716001. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000187

FIDIC. (1999). Conditions of contract for plant and design-build (1st ed.). Fédération Internationale des Ingénieurs-Conseils.

Galih Laduni A. et al. (2023). Identifikasi risiko proyek konstruksi dengan penerapan kontrak design and build: Sebuah kajian pustaka. Seminar Nasional Teknik Sipil, 1(1).

Perkins, R. A. (2009). Sources of changes in design-build contracts for a governmental owner. Journal of Construction Engineering and Management, 135(7), 588–593. https: //doi.org/10.1061/(ASCE)0733-9364(2009)135:7(588)

Rahardjo, S. (1991). Ilmu hukum. Citra Aditya Bakti.

Sriwidodo, J., & Kristiawanto. (2021). Memahami hukum perikatan. Kepel Press.

Taurano, G. A., & Hardjomuljadi, S. (2013). Analisis faktor penyebab klaim pada proyek konstruksi yang menggunakan fidic conditions of contract for plant and design build. Konstruksia, 5(1).

Yuristanti, T. (2020). Analisis kinerja proyek design and build pada proyek jalan di direktorat jenderal bina marga [Masters thesis]. Institut Teknologi Sepuluh Nopember.

Undang-Undang Nomor 2 Tahun 2017 tentang Jasa Konstruksi. (2017).

Peraturan Pemerintah Nomor 22 Tahun 2020 tentang Peraturan Pelaksanaan Undang-

Undang Nomor 2 Tahun 2017 tentang Jasa Konstruksi. (2020).

Peraturan Pemerintah Nomor 14 Tahun 2021 tentang Perubahan atas Peraturan Pemerintah Nomor 22 Tahun 2020 tentang Peraturan Pelaksanaan Undang-Undang Nomor 2 Tahun 2017 tentang Jasa Konstruksi. (2021).

Peraturan Presiden Nomor 16 Tahun 2018 tentang Pengadaan Barang/Jasa Pemerintah. (2018).

Peraturan Presiden Nomor 12 Tahun 2021 tentang Perubahan atas Peraturan Presiden Nomor 16 Tahun 2018 tentang Pengadaan Barang/Jasa Pemerintah. (2021).

Peraturan Presiden Nomor 46 Tahun 2025 tentang Perubahan Kedua atas Peraturan Presiden Nomor 16 Tahun 2018 tentang Pengadaan Barang/Jasa Pemerintah. (2025).

Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Nomor 14 Tahun 2020 tentang

Standar dan Pedoman Pengadaan Jasa Konstruksi Melalui Penyedia. (2020).

Downloads

Published

06-06-2026

How to Cite

Formulasi Klausul Perubahan Desain dalam Kontrak Design and Build untuk Menjamin Kepastian Hukum. (2026). SETARA : Jurnal Ilmu Hukum, 7(1), 1-9. https://doi.org/10.59017/setara.v7i1.594